Basic Provisions for Acceptance of Lift Works
Release time:
2022-06-16
Installation process refers to the construction site to guide the installer to complete the operation of the technical documents, installation process can also be called installation manual or installation instructions.
I. The quality management of the construction site of the installation unit shall comply with the following provisions:
1. With perfect acceptance standards, installation techniques and construction procedures.
2. With a sound installation process control system.
3. Installation process refers to the construction site to guide the installer to complete the operation of the technical documents, installation process can also be called installation manual or installation instructions.
4. Installation process control system refers to the lift installation unit in order to achieve process control, the development of the upper and lower processes between the acceptance of the protocol.
Second, the lift installation project construction quality control shall comply with the following provisions:
1. The civil construction handover inspection shall be carried out according to this specification before the lift installation.
2. Before the installation of the lift should be in accordance with this specification for the acceptance of the entry of the lift equipment.
3. The sub-projects of lift installation shall be quality controlled according to the enterprise standard, and each sub-project shall have self-inspection record.
Third, the quality acceptance of the lift installation project shall comply with the following provisions:
1. The personnel who participate in the construction and quality acceptance of the installation project shall have the corresponding qualification.
2. The unit undertaking the relevant safety performance testing must have the appropriate qualifications. Instruments and equipments shall meet the requirement of accuracy and shall be within the validity period of verification.
3. The quality acceptance of sub-projects should be carried out on the basis of self-inspection by the lift installation unit.
4. The quality of sub-projects should be checked and accepted according to the main control project and general project respectively.
5. Concealed works shall be notified to the relevant units for inspection and acceptance before concealment after the lift installation unit passes the inspection and form the acceptance document.